Unload 120,000 lb boiler from rail using 250 ton mobile crane, move to opposite side of plant using one 40 Ton and one 50 Ton Fork Truck, relocate 250 ton crane to opposite side of plant to hoist and place boiler onto foundation pad.
Transportation of Oversized E-House for Solar Industry
Transportation of Oversized E-House for Solar Industry
25 Ton Overhead Crane Installation at a Windmill Manufacturer
25 Ton Overhead Crane Installation at a Windmill Manufacturer