Loading out the last of the Verson twin slide press bases at the former GM Transmission Plant, Windsor Ont., June 2017
Unload / Move 120,000 lb Boiler from Rail using Crane and Fork Trucks
Unload 120,000 lb boiler from rail using 250 ton mobile crane, move to opposite side of plant using one 40 Ton and one 50 Ton Fork Truck, relocate 250 ton crane to opposite side of plant to hoist and place boiler onto foundation pad.
Installation of 87 ft span 90,000 lb Capacity Overhead Stacker Crane
Installation of 87 ft span 90,000 lb Capacity Overhead Stacker Crane